PRASANNA JANARDHANAN
Jacksonville
Florida
PROFESSIONAL SUMMARY
· Four years of Greenfield projects engineering experience including procurement, winning contracts,
manufacturing and construction.
· Excellent exposure and experience in process improvement, lean standardization and
benchmarking to successfully employ best business practices.
· Proficient in optimal facility layout, logistics management and interfacing with cross functional
teams.
· Well versed in project lifecycle management – key skills include strategy setting, flawless execution
and on time within budget delivery.
EDUCATION:
M.S. Industrial Engineering, August 2011
B.E. Industrial Engineering, May 2009
TECHNICAL SKILLS
Certifications / Training
Scheduling
Facility Layout, SCM and
Logistics
Design, Manufacturing and
Construction
Others
469-816-4494
jprasanna20@gmail.com
Curtin University, Bentley – Perth, Australia
Anna University, Chennai, India
Professional Engineer- Engineers Australia, Lean Six Sigma, 5S, Project
Management Professional (PMP), Marketing, APICS CSCP ( In progress)
Coupa Cloud (Procurement), MS Access, Project, Primavera P6 (Project
Planning & scheduling)
Mathematical Programming MATLAB, O-Matrix , Lindo, Tora, Fortran (Optimal Control)
Myopic and Exchange Heuristics (Facility Allocation), Leankit Kanban
AutoCAD, 3D Navisworks simulate, Occupational Health & Safety (OHS),
Elevated Work Platforms and Confined spaces
MS Office Suite, Excel Macros, Adobe Editors, Arena 7 (Simulation)
EXPERIENCE
Senior Engineer - Projects, DDH Engineering Consultant
Jan 2015 – Jul 2015
· Lead a cross functional engineering management team and systems for high integrity control,
development and implementation of bulk ore handling rail system from mine to port.
· Provided accurate routing information to ensure that delivery times and locations are coordinated.
· Expanded long haul control system from design concept through to prototype and production, and
within the systems engineering frameworks.
· Research and development into innovative systems and products for utilization in the engineering
sectors and the provision of value engineering solutions.
SMP Project Engineer, T&G Corporation Consulting Engineering
In association with Mineral Resources Limited
May 2012 – Dec 2014
Rio Tinto Nammuldi Belo Water Table $2bln Project :
· Led a project to coordinate Civil, Structural & Mechanical design layout providing technical support
to ensure a smooth operation from initiation to execution phase.
· Train process engineers and mechanical engineers to perform load Analysis for wet plant process
buildings using Helix conveyor data and verified optimal load factor prior to design and detail.
· Perform generation and compilation of engineering and equipment specifications.
BHP Billiton (South 32) Ore Handling Newman - $25m project
· Requirements gathering, analyses, map high level customer needs and convert into a prototype/
general arrangement 2D drawing/3D model for solution proposal.
· Supported 3D Model analysis and clash detection using 3D Navis simulate for external review.
· Coordinated in generation and compilation of material order lists and fabrication drawings.
· Developed, implemented and monitored project schedules by monitoring agreed variances.
Fortescue Metals Group – Christmas Creek Iron ore Expansion - $90m project
· Negotiated higher flexibility with various contracts/ vendors giving Mineral Resources Limited a
procurement saving worth $550,000 of equipment and supplier costs in one fiscal year.
· Contributed to project budget by expanding the solutions to enable accurate data gathering and
reconciliation activities.
Project Support Officer, SRK Solutions
Aug 2011 – May 2012
· Evaluated and helped Identifying right set of tools for geotechnical exploration and reporting on
project risks ensuring project health monitoring, rectification and action plans.
· Implemented a workflow solution on TrackVia identified on SRK geo-technical engineering standard
and Project Management Instruction PMI.
· Created long term road maps and detailed project plans.
· Supported embedding IPD model to improve project delivery outcomes.
Maintenance Scheduler, Rio Tinto Operations Centre
Aug 2010 – July 2011
· Developed product screen reliability model for Iron Ore Operations using preventive maintenance
order evaluation hitting 85%, 90%, 95% mark by Arena 7 Discrete Event Simulation.
· Trained a 20 person team of Linemen, superintendents and employees across all levels of preventive
maintenance at three types of product filtration area.
· Prototype solution proves $150,000 operational savings per year, cutting costs due to breakdown,
labor and maintenance.